Traffic Chaos Coming

Oct 13th, 2014 | By | Category: Winter 2012

By Hans Looije

In April 2013 the TTC will start reconstruction of the Kingston road streetcar lines. This means that three of the four lanes of traffic will be closed in sections starting at the short turn loop near Queen and extending all the way to Victoria Park. There will be two crews working – one will do the track from Queen to Waverley and the other crew will do the track from Waverley to Victoria Park. With lanes closed, commuters will be using the Triangle to get by the construction. We will probably see Dixon turned into a two-way street until the tracks are completed to Woodbine. Part of the project will include reconfiguration of the Dundas/Kingston/Dixon intersection and rebuilding of the sidewalks.

Tags: , ,

Leave a Comment

Protected with IP Blacklist CloudIP Blacklist Cloud